Aravana production resumes at Sabarimala

The unit will initially produce around 1.5 lakh tins a day, with output expected to rise to around 3.5 lakh tins daily after October 20. At full capacity, the plant can produce between 3.25 lakh and 3.65 lakh tins a day, TDB said.
Read the full story on The Hindu Opens thehindu.com in a new tab
This is a short summary of a story published by The Hindu, shown with a link to the original. The full story, photo and reporting belong to The Hindu.

















