Mumbai Metro 7A construction resumes, Airports Authority of India clearance awaited

Mumbai Metro Line 7A construction has resumed despite a 2.5-metre height breach near the airport, with the MMRDA awaiting final clearance from AAI.
Read the full story on Hindustan Times Opens hindustantimes.com in a new tab
This is a short summary of a story published by Hindustan Times, shown with a link to the original. The full story, photo and reporting belong to Hindustan Times.

















