Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents

Prolonged stoppage has raised concerns over safety and durability of the 110-metre stretch of tunnelling already completed in the right tube on Anakkampoyil side. KRCL and the contracting agency have reportedly warned that continued suspension could lead to deterioration of the completed work
Read the full story on The Hindu Opens thehindu.com in a new tab
This is a short summary of a story published by The Hindu, shown with a link to the original. The full story, photo and reporting belong to The Hindu.















